APTEL upholds HERC’s rejection of Dadupur Hydro Project tariff revision, holds developer responsible for failure to verify design parameters

Elekore Energy Desk
APTEL upholds HERC’s rejection of Dadupur Hydro Project tariff revision, holds developer responsible for failure to verify design parameters

The Appellate Tribunal for Electricity (APTEL) has declined to allow Bhoruka Power Corporation Limited (BPCL) to reopen the tariff of its 6 MW Dadupur Small Hydro Project in...