We Evaluate
We Analyse

You Decide

India's energy sector moves fast.
We make sure you move faster.

8th Annual India Coal Conference 2026 8th Annual India Coal Conference 2026 8th Annual India Coal Conference 2026 8th Annual India Coal Conference 2026

8th Annual India Coal Conference 2026

Hotel Hyatt Regency, New Delhi, India

17 Nov 2026 - 19 Nov 2026

Learn More
Energy market insights dashboard

Every Insight You Need in One Place

From daily market prices to regulatory shifts, we bring India's energy data into a single view. No more switching between multiple sources—just one dashboard that thinks ahead. Built by sector specialists who've sat where you sit, watched the same markets, and felt the same pressure to decide fast. Power, coal, and renewables—tracked, benchmarked, and explained in plain language.

Latest Insight

Stay ahead with expertly curated news, handpicked by our team—from the latest regulations,
orders to judgments—all delivered straight to your fingertips.

HPERC approves long-term PPA for 2 MW Sheel Hydro Project at interim tariff of INR 5.05 per kWh

HPERC approves long-term PPA for 2 MW Sheel Hydro Project at interim tariff of INR 5.05 per kWh

The Himachal Pradesh Electricity Regulatory Commission (HPERC) has approved a long-term Power Purchase Agreement (PPA) between the Himachal Pradesh State Electricity Board Ltd...

HPERC clears PPAs for nine solar projects totalling 9.49 MW, fixes tariff at INR 3.40-3.47 till March 2028

HPERC clears PPAs for nine solar projects totalling 9.49 MW, fixes tariff at INR 3.40-3.47 till March 2028

The Himachal Pradesh Electricity Regulatory Commission (HPERC) has approved the Power Purchase Agreements (PPAs) between the Himachal Pradesh State Electricity Board Ltd...

MoP allots 198 MW of Buxar TPP's unallocated power to Himachal Pradesh for winter months till 2030-31

MoP allots 198 MW of Buxar TPP's unallocated power to Himachal Pradesh for winter months till 2030-31

The Ministry of Power has allocated 198 MW, representing the 15% unallocated share of the 2×660 MW Buxar Thermal Power Project, to Himachal Pradesh for five years, covering...

BERC approves 100 MW Agri-Waste power purchase from SAEL Industries, extends must-run status to similar projects

BERC approves 100 MW Agri-Waste power purchase from SAEL Industries, extends must-run status to similar projects

The Bihar Electricity Regulatory Commission (BERC) has approved Bihar State Power Holding Company Ltd’s (BSPHCL) proposal to procure 100 MW (4 × 25 MW) from an...

India’s installed capacity reaches 558.90 GW; solar accounts for 79% of April–September addition

India’s installed capacity reaches 558.90 GW; solar accounts for 79% of April–September addition

India’s installed power capacity stood at 558.90 GW at the end of September 2026, up from 532.74 GW in March 2026. The net addition of 26,156 MW in FY 2026–27 so far (April to...

NTPC REL Issues Tranche-II Wind Tender for 1080 MW Capacity with 10-Year O&M in Andhra Pradesh

NTPC REL Issues Tranche-II Wind Tender for 1080 MW Capacity with 10-Year O&M in Andhra Pradesh

NTPC Renewable Energy Limited (NTPC REL), a wholly owned subsidiary of NTPC Limited, has floated an Invitation for Bids on October 23, 2026, for the development of Phase-1 Wind...

MERC bars MSEDCL from levying 25% additional demand charges on Mukand, orders refund with interest

MERC bars MSEDCL from levying 25% additional demand charges on Mukand, orders refund with interest

The Maharashtra Electricity Regulatory Commission (MERC), in its order dated 22.10.2026 in Case No. 31 of 2026, has directed MSEDCL to stop levying the 25% additional demand...

MERC partly allows Vighnahar sugar mill's late payment claim, directs MSEDCL to INR 34.57 lakh for delayed payments

MERC partly allows Vighnahar sugar mill's late payment claim, directs MSEDCL to INR 34.57 lakh for delayed payments

The Maharashtra Electricity Regulatory Commission (MERC) has directed Maharashtra State Electricity Distribution Company Limited (MSEDCL) to pay Shri Vighnahar Sahakari Sakhar...

NCT recommends four transmission schemes worth INR 4,364.55 crore, including synchronous condensers at Bhadla-III and Ramgarh

NCT recommends four transmission schemes worth INR 4,364.55 crore, including synchronous condensers at Bhadla-III and Ramgarh

The National Committee on Transmission (NCT) has recommended four new inter-state transmission schemes with a combined estimated cost of INR 4,364.55 crore. At its 43rd meeting,...

APTEL dismisses NTPC REL‘s appeal over higher grid connectivity charges for Rajasthan solar projects

APTEL dismisses NTPC REL‘s appeal over higher grid connectivity charges for Rajasthan solar projects

The Appellate Tribunal for Electricity (APTEL) has dismissed an appeal by NTPC Renewable Energy Limited (NTPC REL) seeking compensation for increased Grid Connectivity Charges...